Primary Responsibilities:This is a full-time on-site role for an Electrical Engineer, who will be responsible for:• Installation, handling & maintenance of all electrical equipment, viz., 160 KWP SolarPanel plant, UPS, Generators, energy saving devices, starters, motors, control panels,HT-LT, switch gears, cabling, water pumps, air-conditioning equipment, lifts, etc.• Designing, developing, testing and supervising the installation of electrical equipment,s
Primary Responsibilities:This is a full-time on-site role for an Electrical Engineer, who will be responsible for:• Installation, handling & maintenance of all electrical equipment, viz., 160 KWP SolarPanel plant, UPS, Generators, energy saving devices, starters, motors, control panels,HT-LT, switch gears, cabling, water pumps, air-conditioning equipment, lifts, etc.• Designing, developing, testing and supervising the installation of electrical equipment,s
Key Responsibilities:Execute work as per GFC drawings Basic & detail engineering for provision of earthing pits of electrical installation.Proper protection system for all electrical installations.Generally responsible for implementations and monitoring of all electrical related works at the site.Estimates prepare and assign the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior t
Key Responsibilities:Execute work as per GFC drawings Basic & detail engineering for provision of earthing pits of electrical installation.Proper protection system for all electrical installations.Generally responsible for implementations and monitoring of all electrical related works at the site.Estimates prepare and assign the resources such as manpower, materials, consumables, equipment, tools, etc., required for all electrical and related works prior t